Author: Delhi Metro Rail Corporation Ltd
Place: Mumbai
Category: Transportation
Keyword: Metro Project, Charkop-Bandra-Mankhurd Corridor, Elevated Line
Abstract: 1- Introduction
2- Evolution of Mumbai Metro Master Plan
3- Traffic Forecast
4- System Selection
5- Civil Engineering
6- Maintenance Depots
7- Train Operation Plan
8- Power Supply Arrangement
9- Environmental Impact Assessment
10- Cost Estimate
11- Financial Viability, Fare Structure and Financing Options
12- Economic Analysis
13- Implementation Plan
14- Conclusion